
Compare louvre window quotations by matching the product specification and completed installation scope before comparing totals. Put missing items in a separate column and request clarification. A cheaper quote may cover less work, while a revised price may reflect a different finish or control arrangement.
Create one comparison sheet
Give each opening a row and each supplier a column. Record the model, dimensions, frame finish, blade material and operation. Add separate rows for screens, removal, delivery, installation and any electrical work. Use “not stated” when the quotation does not answer a point.
Do not silently fill a blank with an assumption from a website. Ask the supplier to confirm the item in the proposal. A website describes the range; a quotation should describe the work being offered to you.
A quick way to spot a scope difference
Suppose one quote includes removal and making good, while another only includes the new window and fitting. Mark the missing work before comparing totals. Ask the second supplier to price it or explain who would arrange it. You can then compare the completed job rather than two different packages.
Keep revisions together
If you change from manual to motorised operation or select a different finish, request a revised document. Save it with a date and retain the previous version for reference. Make clear which version is being considered for approval.
Check that a revision covers every affected opening. A change discussed for one room should not accidentally become a whole-house substitution. Refer to opening labels rather than relying on the order of photographs in a message thread.
Compare responsibility as well as price
Identify who measures, supplies, installs and responds to defects. Ask whether wall repairs or finishing after removal are included. Confirm how proposed delivery dates depend on measurement, approval and other site work.
A lower price may still be suitable, but the difference should be understood. The useful decision is between complete proposals that meet your needs, not between isolated totals with unresolved exclusions.
Use a like-for-like worksheet
| Item | Proposal A | Proposal B |
|---|---|---|
| Model and blades | Record the stated specification. | Record the stated specification. |
| Removal and disposal | Included / excluded / not stated. | Included / excluded / not stated. |
| Making good | Describe the finish included. | Describe the finish included. |
| Revision | Quote number and date. | Quote number and date. |
Resolve each “not stated” item before treating the totals as comparable. Keep prices in the supplier’s currency and check whether the quoted totals include any applicable charges.
Once you choose a proposal, use the order approval checklist to check that the latest documents match.
Keep the comparison sheet with the final approved quotation. If you are still building a shortlist, start with our guide to researching aluminium louvre windows online.
Frequently asked questions
Why can two quotes for the same opening have different totals?
They may specify different blades, finishes, controls or installation work. Compare the complete scope and resolve exclusions before deciding whether the totals represent equivalent proposals.
How should I compare a quote with missing details?
Mark the missing item as not stated and request written clarification. Do not fill the gap with an assumption taken from a brochure or an earlier conversation.
Which quotation should I keep after changing the specification?
Keep the latest revised quotation clearly identified as the version under consideration or approval. Retain earlier versions for reference, but make sure the final drawing and finish selection match the approved version.